| Pr_25_71_29_04 | Architectural finish permanent formwork linings |
| Pr_25_71_29_11 | Carbon steel permanent joint formers |
| Pr_25_71_29_14 | Collapsible (wet) board substructure formwork |
| Pr_25_71_29_15 | Collapsible board substructure formwork |
| Pr_25_71_29_16 | Compressible board substructure formwork |
| Pr_25_71_29_17 | Concrete permanent side forms |
| Pr_25_71_29_19 | Controlled permeability formwork |
| Pr_25_71_29_24 | Duct formers |
| Pr_25_71_29_28 | Expanded carbon steel mesh formwork |
| Pr_25_71_29_34 | Glass fibre-reinforced concrete permanent formwork panels |
| Pr_25_71_29_37 | High-density expanded polystyrene (HDPS) substructure formwork |
| Pr_25_71_29_52 | Modular riser flooring units |
| Pr_25_71_29_56 | Non-critical permanent formwork |
| Pr_25_71_29_60 | Permanent concrete composite wall panels |
| Pr_25_71_29_62 | Permanent insulation formwork (PIF) |
| Pr_25_71_29_64 | Permanent timber formwork |
| Pr_25_71_29_72 | Ribbed carbon steel mesh formwork |
| Pr_25_71_29_76 | Scaffolding and accessories |
| Pr_25_71_29_84 | Stone finishing battens |
| Pr_25_71_29_86 | Suspended in situ concrete construction permanent insulation formwork (PIF) |
| Pr_25_71_29_88 | Timber scaffold boards |